Rail Corridor (End To End)
The old railway line from Tanjong Pagar to Kranji: a green, car-free trail, partly gravel. Two stretches are closed for works, so the route goes round them.
Distance
23.7 km
Point-to-point
Est. Time
1 h 46 min
1 h 42 min moving + ~5 min at lights
Climbing
↑73 m
Max grade 5.6%
Park Connectors
79%
PCN & shared paths
Traffic Lights
6
~5 min red wait
Elevation Profile
Low: 4m · High: 44m · Total climb: ↑73m
Key Checkpoints & Landmarks
1
Rail Corridor (Tanjong Pagar)
1.2729, 103.8341
2
Rail Corridor (Buona Vista)
1.3092, 103.7912
3
Bukit Timah Railway Station
1.3346, 103.7813
4
Rail Corridor (Hillview)
1.3617, 103.7664
5
Rail Corridor (Sungei Kadut)
1.4029, 103.7534
6
Rail Corridor (Kranji)
1.4297, 103.7566
Tips for Riding Rail Corridor (End To End)
• Surface: The Rail Corridor features gravel, compressed earth, and tarmac. Wide tyres (32mm+) or gravel/mountain bikes are ideal.
• Connecting Points: Easy access from Tanjong Pagar, Buona Vista MRT, King Albert Park MRT, Hillview MRT, and Kranji.
• Closures: Two stretches are closed for works: Spooner Road (Kampong Bahru Road) to Henderson Road, for trail improvement work until 31 July 2027, and Choa Chu Kang Road to Villa Verde Park near Bukit Panjang. The route goes round both on nearby paths and park connectors, then rejoins the corridor.
• Dismount: The short gravel bridges by Bukit Timah Railway Station are marked dismount: walk your bike across.
• Live Route Customization: Click "Open Interactive Route" above to adjust waypoints, avoid traffic lights, or add stops for water points and toilets in Pedalah.