Park connectors

Central Urban Loop

Bishan-Ang Mo Kio Park, the Kallang river, Marina Bay and Serangoon.

Distance
34 km
Circular loop
Est. Time
2 h 34 min
2 h 16 min moving + ~18 min at lights
Climbing
↑48 m
Max grade 5.2%
Park Connectors
67%
PCN & shared paths
Traffic Lights
24
~18 min red wait
Elevation Profile Low: 1m · High: 27m · Total climb: ↑48m

Key Checkpoints & Landmarks

1
Bishan-Ang Mo Kio Park
1.3652, 103.8363
2
Kallang Riverside Park
1.3072, 103.8683
3
Gardens by the Bay East
1.2909, 103.8687
4
Geylang Park Connector
1.3175, 103.8910
5
Serangoon
1.3580, 103.8750
6
Bishan-Ang Mo Kio Park
1.3652, 103.8363

Tips for Riding Central Urban Loop

• Path Etiquette & Speed Limit: 25 km/h on shared Park Connector Network (PCN) paths; 10 km/h on footpaths. Yield to pedestrians and ring your bell early before passing.
• Rest Stops & Facilities: Park connectors connect major NParks hubs featuring water coolers, public toilets, and bike repair stands.
• Recommended Bike: Hybrid, gravel, folding bike, city commuter, or mountain bike.
• Live Route Customization: Click "Open Interactive Route" above to adjust waypoints, avoid traffic lights, or add stops for water points and toilets in Pedalah.

Related Singapore Cycling Routes